Guest-room automation
Lighting, shading, climate and room-status scenes are defined around each room type and the guest's everyday journey.

Plan hotel automation around guest rooms, shared spaces and operations
We design room automation, lighting, shading, climate, energy management, access and shared-area control for hotels and boutique hospitality projects around both the guest experience and operating needs.
Hotel automation should give guests simple comfort while providing the technical team with a clear, serviceable system.Discuss your project ↗︎
01 / Project approach
Project-specific deliveryScope, infrastructure, handover and service are adapted to the building type, programme and intensity of use.
Lighting, shading, climate and room-status scenes are defined around each room type and the guest's everyday journey.
Corridors, lobbies and other shared spaces are coordinated with operating hours, maintenance access and energy-management goals.
A pilot room validates controls, sensors, panels and software before approved details are rolled out across the project.
A hotel automation system extends beyond the room control panel. Room types, lighting and climate scenes, energy strategy, shared spaces, service access and user interfaces must be planned together so the result remains manageable for guests and the operations team.
For investors who need room and shared-area technology aligned with the guest experience, operating model and project scope.
For teams coordinating panels, switches, sensors and technical infrastructure with interior and electrical design at an early stage.
For operators who need clear room standards, planned maintenance access and an understandable service structure.
Room types, shared spaces, use scenarios, technical-team expectations and current project documents are reviewed together.
Control points, visible surfaces, panels, software and integration scope are resolved and tested in a selected room type.
Approved details are applied to the room types, followed by site testing, commissioning and a planned operations handover.
See each project's scale, brands and Digital Design's scope of work.
80 Rooms · HDL-Hager · Hotel Room and Common Area Automation
In-room lighting and climate control, common-area lighting and climate control, central hotel automation systems, switch and socket ranges
Explore the project scopeHager · Switches and Sockets
Hager switch and socket ranges were used
Explore the project scopeDepending on the project, guest rooms can include lighting, shading and climate control; shared areas can include lighting and climate scenes; energy management, access and selected integrations can also be assessed.
A pilot room verifies control and switch positions, scenes, electrical and mechanical connections, and operational expectations in the real space before repeated installation begins.
Yes, where the existing panels, cabling, room types and operating systems support a viable renewal or phased transition. These conditions need a technical survey.
Room counts and types, architectural and electrical plans, project stage, location, target control functions and existing system information provide a useful starting point.
Share the room count and types, project stage, location and systems to be controlled so we can frame a practical first scope.